Grejsdalen pedestrian and bicycle bridge

Year: 2023

Weight: 120 tons

Location: Denmark

Scope: delivery of steel structure and railings, trial assembly, third party control of manufacturing and surface treatment, epoxy resin on the deck – QUBIK system

Additional information about the project:

  • Material: corten
  • Total bridge length: 130m, transported in 7 sections, the width of 1 section: 3m
  • 5 meter long bridge supports (made of rolled plates)
  • Railings made of twisted flat bars and brushed stainless steel handrails
  • Complex construction geometry, verified by trial assembly
  • On-site assembly with a 750 t crane (one of the largest in Denmark)