Year: 2025
Weight: 30 tons
Location: Sweden
Scope: workshop drawings, delivery of steel structure and railings, trial assembly of arch and railings, third party control of manufacturing and surface treatment, coordination of safe grip application on the deck
Additional information about the project:
- Total bridge length: 35m, the width: 5m